concrete
Well-known member
- Joined
- Oct 4, 2020
- Messages
- 18,826
- Reaction score
- 82,484
- Points
- 123
It’s a sort of spider knot combo. To make the loop it’s four turns and when I attach the loop to the leader it’s a grinner with five turns at first, bring the line back and them four turns over the original turns if that makes sense.I’ve used it b4 on my fathoms good line but had massive problems with tieing the knots as it’s slippery stuff, which knot do you use